September 13, 2014
In addition, the deck will need to be removed and replaced. Estimates are that the repairs to cost as much as $40,000.00. Tama City Clerk, Judy Welch, said that the substructure repairs need to be completed in 2015 although the deck surface can wait until 2017.
The 100th Anniversary of the bridge opening will occur in 2015. It was placed on the NRHP in 1987. The distinctive bridge is known primarily for its railing balustrades that spell out LINCOLN HIGHWAY.
A small park, adjacent to the northeast quadrant of the bridge, is the location of a monument to the bridge. A support group, the Lincoln Highway Bridge Park Organization Tama-Toledo supports the park in several ways.
The article can be seen on the paper's website: http://www.tamatoledonews.com/page/content.detail/id/548245/Tama-s-historic-Lincoln-Highway-Bridge-is-in-need-of-structure-and-surface-repairs.html